  • Monday 7 July – Friday 29 August: parking bay suspensions and road closures in Nuthall Road between Llanberis Grove and Western Boulevard for carriageway resurfacing works
  • Monday 14 July – Friday 5 September: parking bay suspension in Hoewood Road between Sellers Wood Drive and Catherine Close for highways works
  • Monday 14 July – Friday 19 September: three-way lights at the junction of Hoewood Road and Sellers Wood Drive for highways works
  • Wednesday 16 July – Friday 14 November: closure of right of way opposite 49 Glapton Lane for resurfacing works
  • Wednesday 23 July – Monday 18 August: ongoing closure of Upper Parliament Street from number 67 to 86 for emergency Severn Trent repairs to an underground pipe
  • Monday 18 August – Wednesday 18 February 2026: parking bay suspensionbetween St Peter’s Court and Midland Court for cladding works
  • Monday 25 August – Monday 24 August 2026: road closures and parking bay suspensions in Brooklyn Road, Kersall Drive and Jesmond Road for development works
  • Monday 21 July – Friday 15 August: parking bay suspension in Sneinton Dale for National Grid works
  • Saturday 2 August – Friday 15 August: two-way lights in Porchester Road, between Forrester Road and Morley Road for cycle way works
  • Sunday 3 August – Sunday 10 August: three-way lights at the junction of Chingford Road and Calveley Road for development works
  • Monday 4 August – Monday 11 August: lane closure in Hucknall Road from Southglade Road to Bestwood Road for resurfacing works
  • Monday 4 August – Sunday 12 August: two-way pedestrian crossing point in Porchester Road next to the existing Forrester Road junction for cycle way project
  • Monday 4 August – Friday 15 August: road closure and parking bay suspension in Clumber Street at the junction with Lincoln Street for development works
  • Monday 4 August – Friday 15 August: two-way lights outside the new Strata Homes development in Radford Road opposite the electric substation for cabling works
  • Thursday 7 August – Monday 11 August: moving lane closure in Hucknall Road between Arnold Road and Valley Road for tree maintenance
  • Sunday 10 August: road closure and parking bay suspension outside 25 Broad Street for Severn Trent works
  • Sunday 10 August: two-way lights in The Midway for roofing works
  • Sunday 10 August: three-way lights in Saltburn Road to allow installation of telegraph pole
  • Sunday 10 August: road closure between 23 and 31 Forman Street for Severn Trent works
  • Sunday 10 August: lane closure at 226 Mansfield Road for new pole installation
  • Sunday 10 August – Tuesday 12 August: three-way lights in Nobel Road between the junction with Porter Close and Hodgkin Close for cabling works
  • Monday 11 August: bus lane closure in Hucknall Road for gas works
  • Monday 11 August: four-way lights at 73 Abbey Street for Severn Trent works
  • Monday 11 August: two-way lights at the junction of Alfreton Road, Canning Circus and St Helen’s Street for upgrading of traffic lights
  • Monday 11 August – Friday 22 August: two-way lights in Lenton Lane for jointing and cabling works
  • Tuesday 12 August: lane closures in Derby Road, Canning Circus and the Ropewalk for upgrade of signal lights
  • Tuesday 12 August – Thursday 14 August: moving lane closure in University Boulevard between Woodside Road and Beeston Road for tree maintenance
  • Wednesday 13 August: four-way lights at the junction of Ilkeston Road, Faraday Road and St Peter’s Street for upgrade of signal lights
  • Monday 14 August – Friday 18 August: road closure in Leonard Avenue from the junction with Hucknall Road to outside number 15 for Severn Trent works
  • Thursday 14 August: three-way lights at the junction of South Sherwood Street and Burton Street for upgrade of signal lights
  • Thursday 15 August: three-way lights at the junction of Woodborough Road and Shelton Street for upgrade of signal lights
  • Friday 15 August: moving lane closure in Beeston Road between University Boulevard and Clifton Boulevard for tree maintenance
  • Saturday 16 August – Sunday 17 August: lane closures on Abbey Street and  Beeston Road for road surveys
  • Saturday 16 August – Sunday 17 August: lane closures outside 337 Derby Roadfor National Grid works
  • Saturday 16 August – Sunday 17 August: three-way lights at Bulwell station car park to install ducting for electrical charging stations
  • Saturday 16 August – Monday 18 August: three-way lights in Armstrong Road for cabling works
  • Sunday 17 August: road closure outside 31 Bridlesmith Gate for crane works
  • Sunday 17 August: three-way lights at 272 Alfreton Road for Severn Trent works
  • Monday 18 August: two-way lights in Hucknall Lane for manhole surveys
  • Monday 18 August – Friday 22 August: lane closure outside number 17 Thames Street for Cadent Gas works
  • Monday 18 August – Friday 22 August: moving lane closure in Middleton Boulevard between Derby Road and Crown Island for tree maintenance
  • Monday 18 August – Friday 22 August: road closure in Thames Street for Cadent Gas works
  • Wednesday 20 August: three-way lights in Edwards Lane for Cadent Gas works
  • Wednesday 20 August – Thursday 21 August: Outside Lane closure on approach to junction with Lenton Boulevard for Severn Trent works
  • Thursday 21 August – Friday 22 August: lane closure close to the junction between Clifton Lane and Clifton Boulevard for highways works
  • Saturday 23 August – Sunday 24 August: three-way lights at Bulwell station car park to install ducting for electrical charging stations
  • Saturday 23 August – Tuesday 26 August: road closure outside number 10 St Peter’s Street for National Grid works
  • Sunday 24 August: road closure in Thames Street at the junction with Dale Street for BT Openreach works
  • Monday 25 August – Saturday 30 August: lane closure in Valley Road from Mansfield Road to Edwards Lane for resurfacing works
  • Tuesday 26 August – Thursday 28 August: road closure and parking bay suspension in North Sherwood Street from the junction with Forest Road East to outside 274 for Severn Trent works
  • Saturday 27 August – Sunday 28 August: 2 Way traffic lights on Vernon Road for Severn Trent works
  • Thursday 28 August: lane closure located on the A610 on approach to the roundabout with Cinderhill Road
  • Saturday 30 August – Sunday 31 August: partial road closure in Castle Boulevard at the junction Wilford Street, plus lane closure in Greyfriar Gate and Wilford Street for Severn Trent works
  • Saturday 30 August – Sunday 31 August: three-way lights at Bulwell station car park to install ducting for electrical charging stations