6.4 C
West Bridgford
Wednesday, December 11, 2024

Nottingham city planned roadworks for this week

Nottingham city planned roadworks for this week – commencing 2 September 2024.

  • Wednesday 31 July – Thursday 5 September: Road closure on Sherwin Road, Lenton & Wollaton East, from Sherwin Road to outside the play area for Cadent gasworks
  • Monday 5 August – Monday 30 September: Road closure and parking suspensions on The Wells Road, plus road closure on Kildare Road, Querneby Road & Mission Street for gasworks
  • Monday 12 August – Friday 27 September: Road closure on Bestwood Road, Bulwell, between Gee Tee signs & 161 Bestwood Road for Severn Trent Water works
  • Monday 19 August – Friday 20 December: 2-way lights on Abbotsford Drive between Teak Close and Church Road for works to the subway structure
  • Thursday 29 August – Wednesday 4 September: Multi-way signals and pedestrian diversion on Carlton Road for emergency Cadent works
  • Friday 30 August – Friday 6 September 9.30am – 3.30pm: Lane closure on Western Boulevard between Crown Island and Aspley Lane for tree trimming works
  • Monday 2 – Thursday 5 September 10pm – 6am: Road closure on the island at Hollington Road and Bathurst Drive for resurfacing
  • Monday 2 September – Sunday 1 November: Suspension of bridle way at the rear of Hawksley Gardens, Clifton West, from its intersection with Yew Tree Lane continuing in a southerly direction to its intersection with Fox Covert Lane for construction works
  • Friday 6 – Saturday 7 September 10pm – 6am: Road closure between Robins Woods Road & Western Boulevard for resurfacing
  • Friday 6 – Saturday 7 September 10pm – 6am: Lane closure on Queens Drive between Castle Bridge Road & Water Street West for resurfacing
  • Monday 9 – Friday 13 September 9.30am – 3.30pm: Lane closure on Middleton Boulevard for tree trimming works
  • Friday 13 – Sunday 15 September: Road closures and no stopping in place during NTU intake as follows:

Gill Street – Road closure whole length & No Stopping at any time all parking bays on both sides.

Hampden Street – Road closure from Dryden Street to Peel Street & No Stopping at any time whole length of Hampden Street all parking bays on both sides.

Dryden Street – Implement one way provision between Peel Street to Dundas Close, No Stopping at any time all parking bays on both sides between Peel Street to Dundas Close.

Peel Street – No Stopping at Any Time the length of Peel Street from the junctions of Waverley Street, Goldsmith Street, Clarendon Street to Addison Street both sides.

- Advertisement -

Clarendon Street – No Stopping at Any Time the length of Peel Street from the junctions of Waverley Street, Goldsmith Street, Peel Street to Chaucer Street both sides.

  • Until 31 March 2025: Parking bay suspension and partial road closure on Kent Street, St Ann’s for construction works
  • Until Thursday 31 July 2025: Road closure on length of Denman Street East, Radford, between Highhurst Street and Thackery Street, for development works
  • Until Thursday 31 July 2025: Road closure of Thackeray Street and Parking bay suspension on Denman Street East, Highurst Street & Boden Street for new development

Follow The Wire on TikTok, Facebook, X, Instagram. Send your story to newsdesk@westbridgfordwire.com or on 0115 772 0418

Categories:
 

 

Latest