Saturday 5 October 2024
10.2 C
Nottingham

Nottingham city planned roadworks for this week

Nottingham planned roadworks week commencing 16 September 2024.

  • Tuesday 10 September – Monday 16 September: Lane closure in Gregory Boulevard outside university for Cadent gas works
  • Friday 13 September – Monday 16 September: 50-metre bus lane closure between 55 and 63-67 Mansfield Road for National Grid to change two electricity network link boxes
  • Friday 13 September – Sunday 15 September: Lane closure 79-85 Talbot Street for unloading to nearby properties
  • Friday 13 September – Sunday 15 September: Road closures and no stopping in place during NTU intake as follows:

Gill Street – Road closure whole length & No Stopping at any time all parking bays on both sides.

Hampden Street – Road closure from Dryden Street to Peel Street & No Stopping at any time whole length of Hampden Street all parking bays on both sides.

Dryden Street – Implement one way provision between Peel Street to Dundas Close, No Stopping at any time all parking bays on both sides between Peel Street to Dundas Close.

Peel Street – No Stopping at Any Time the length of Peel Street from the junctions of Waverley Street, Goldsmith Street, Clarendon Street to Addison Street both sides.

- Advertisement -

Clarendon Street – No Stopping at Any Time the length of Peel Street from the junctions of Waverley Street, Goldsmith Street, Peel Street to Chaucer Street both sides.

  • Sunday 15 September (9.30am-3.30pm): Two-way lights at 927 Hucknall Road for work to overhead structure
  • Saturday 21 September – Sunday 22 September: multi-way signals opposite Cowan Street to St Ann’s Wells Road for development and road crossing works
  • Monday 16 September – Wednesday 25 September: two-way lights opposite 13-23 Willoughby Street for Severn Trent Water to fit new water connections
  • Monday 16 September – Friday 27 September: multi-way signals in Top Valley Drive for Network Plus/Cadent gas main replacement
  • Sunday 22 September: Two-way lights in Strelley Road at the junction with Wigman Road to allow Severn Trent Water
  • Sunday 22 September: Lane closure in Maid Marian Way for structural survey to NCP car park
  • Monday 30 September – Sunday 1 December: Bus-lane closure, 33 Mansfield Road to just outside Woodthorpe Drive for Cadent gas main replacement
  • Monday 5 August – Monday 30 September: Road closure and parking suspensions on The Wells Road, plus road closure on Kildare Road, Querneby Road & Mission Street for gasworks
  • Monday 12 August – Friday 27 September: Road closure on Bestwood Road, Bulwell, between Gee Tee signs & 161 Bestwood Road for Severn Trent Water works
  • Monday 19 August – Friday 20 December: 2-way lights on Abbotsford Drive between Teak Close and Church Road for works to the subway structure
  • Monday 2 – Tuesday 17 September: Multi-way signals at the junction of Ransom Road and Caunton Avenue for Cadent gasworks, expected to be mainly off-peak
  • Monday 2 September – Sunday 1 November: Suspension of bridle way at the rear of Hawksley Gardens, Clifton West, from its intersection with Yew Tree Lane continuing in a southerly direction to its intersection with Fox Covert Lane for construction works
  • Tuesday 10 – Monday 16 September: Lane closure Gregory Boulevard outside Open University for Cadent gasworks
  • Saturday 14 September 9.30am – 3.30pm: 3-way lights on Woodbank Drive Wollaton for Severn Trent Water works
  • Saturday 21 September 10.01pm – Sunday 22 September 8.45am: Road closure at level crossing on Colwick Road, Dales for level crossing inspection
  • Sunday 29 September 00.01am – 7.30am: Road closure at level crossing on Colwick Road, Dales for level crossing inspection
  • Monday 30 September – Sunday 1 December: Road closure on Elmswood Gardens Sherwood, at junction with Mansfield Road for Cadent gasworks
  • Until 31 March 2025: Parking bay suspension and partial road closure on Kent Street, St Ann’s for construction works
  • Until Thursday 31 July 2025: Road closure on length of Denman Street East, Radford, between Highhurst Street and Thackery Street, for development works
  • Until Thursday 31 July 2025: Road closure of Thackeray Street and Parking bay suspension on Denman Street East, Highurst Street & Boden Street for new development

Follow The Wire on TikTok, Facebook, X, Instagram. Send your story to newsdesk@westbridgfordwire.com or via WhatsApp on 0115 772 0418

Categories:
 

Latest