These are the planned Nottingham city roadworks for next week.
- Friday 5 January – Friday 26 April: Lane closure on Western Boulevard for gas mains replacement
- Monday 8 January for 12 weeks 9.30am – 3pm: Lane closure on Lower Parliament Street, city centre, and pedestrian diversion, for traffic light works
- Monday 22 January – Saturday 2 March: 4-way lights and off-peak lane closures as required at Junction of Bulwell High Road / Ravensworth Road / Main Street, Bulwell for traffic light refurbishment
- Monday 22 January – Saturday 2 March: 4-way lights with off-peak lane closures as required at Junction of A611 Hucknall Road / Haydn Road for traffic light refurbishment
- Monday 22 January – Friday 29 March 8am – 5pm daily: Road closure and parking suspension on Burford Road, Hyson Green and Arboretum, for whole road from Gregory Boulevard to Gladstone Street for road resurfacing
- Monday 22 January – Friday 29 March 8am – 5pm daily: Road closure and parking suspension on Church Street, Basford between Nottingham Road to Basford Road for road resurfacing
- Monday 22 January – Friday 29 March 8am – 5pm daily: Road closure and parking suspension on Ilkeston Road, Radford between St Helens Street to Seely Road for road resurfacing
- Monday 22 January – Friday 29 March 8am – 5pm daily: Road closure and parking suspension on Lincoln Street, Basford between Nottingham Road and David Lane for road resurfacing
- Monday 22 January – Friday 29 March 8am – 5pm daily: Road closure and parking suspension on Wilford Crescent East, Meadows between Felton Road and Bathley Street for road resurfacing
- Monday 22 January – Friday 29 March 8am – 5pm daily: Road closure and parking suspension on Willow Road, Lenton between Games Workshop car park and end of the street for road resurfacing
- Monday 26 February – Monday 20 May 9.30am – 3pm as needed: Lane closure on full length of Western Boulevard for Cadent gasworks
- Wednesday 28 – Thursday 29 February: Road closure on Cobden Street, Radford, from junction of Ilkeston Road to The Old Bakehouse for utilities works
- Thursday 29 February 1am – 5am: Road closure on Pastures Avenue, Clifton East at junction with Farnborough Road for telecoms works
- Friday 1 – Monday 4 March: Road closure on Stansfield Street, Radford, at junction with Ilkeston Road for new high voltage connection
- Sunday 3 March 8am – 6pm: Road closure on Woodside Road, Lenton & Wollaton East, coming off Priory Island onto Derby Road. Closure ends before Wollaton Vale. For telecoms works.
- Thursday 7 – Friday 8 March 3am – 6am: 3-way lights adjacent to 264 Sneinton Dale for Severn Trent Water works
- Thursday 7 – Friday 8 March 3am – 6am: Lane closure adjacent to Greenburn and Sherwood House, Daleside for Severn Trent Water works
- Friday 8 – Monday 11 March: Road closure between 13-25 Montague Street Bulwell for utilities works
- Monday 11 – Friday 15 March: Road closure on Denman Street East, Radford at junction with Highurst Street for National Grid works
- Wednesday 13 – Saturday 16 March: Road closure on Beaconsfield Street, Hyson Green & Arboretum and parking suspensions between 2a & 6 for Severn Trent Water works
- Friday 15 – Saturday 16 March 9pm – 5am: Road closure on southbound Middleton Boulevard near QMC for inspection of bridge. Divert via exiting and rejoining using the sliproad
- Monday 18 – Friday 22 March: Road closure on Elm Bank, Mapperley, from junction of Elm Bank Drive to outside 12 Elm Bank, for Cadent gasworks
- Tuesday 19 – Friday 22 March: Road closure on Player Street, between junction of Radford Boulevard to junction of Osbourne Street for National Grid works
- Wednesday 20 – Friday 22 March: Road closure between 43-49 Morris Road, Bilborough for Severn Trent Water works
- Monday 25 March – Friday 5 April: Road closure on Woodthorpe Road, Mappeley, from junction of Woodborough Road to junction of Sherwood Vale for Severn Trent Water works
- Monday 25 March – Thursday 11 April: Road closure on Moor Road, Bilborough, between health centre and Strelley Road for Cadent gasworks
- Monday 25 March – Friday 12 April: Road closure on Ambleside Road Leen Valley, at junction with Aspley Lane for Cadent gasworks
- Monday 25 March – Sunday 14 April: Road closure on Homefield Road, Leen Valley – at junction with Nuthall Road for Cadent gasworks
- Friday 29 March – Sunday 14 April: One-way road closure on Top Valley Drive, Bestwood, from the island that meets Bestwood Park Drive West to the junction of Old Farm Road for Cadent gasworks
- Sunday 31 March & Sunday 7 April: Road closure on Warser Gate, city centre, at junction with Fletcher Gate for Cadent gasworks
- Until Sunday 28 April 2024: Lane closure 24 hours on Glasshouse Street and 9.30am – 3.30pm on Lower Parliament Street for development works
- Until 29 August 2024: Road closure on Howard Street, St Ann’s for construction works
- Until 31 March 2025: Parking bay suspension and partial road closure on Kent Street, St Ann’s for construction works
- Until Thursday 31 July 2025: Road closure of Thackeray Street and Parking bay suspension on Denman Street East, Highurst Street & Boden Street for new development