NET trams to run less often at peak times after weeks of cancellations

Nottingham’s trams will run every 10 minutes instead of every seven at peak times from Monday 30 November, as operator Nottingham Express Transit (NET) cuts the number of scheduled departures to give it more time to repair trams.

The temporary timetable runs until Sunday 31 January. It means roughly 30% fewer scheduled departures on each line during periods when trams would normally run every seven minutes. NET says the change should make services more dependable after weeks of cancellations, including departures before 7am.

What changes for passengers?

Time From each terminus Between David Lane and Nottingham Station
06:00–07:00 Every 15 minutes About every 7 minutes
07:00–21:00 Every 10 minutes Every 5 minutes
21:00–00:00 Every 15 minutes About every 7 minutes

 

The biggest change is for passengers who rely on one line during the weekday rush hour. A seven-minute service provides eight or nine scheduled trams an hour in each direction. The temporary timetable provides six.

Passengers who can use either line on the shared stretch through the city centre will still have a tram every five minutes during the day. NET’s usual guide already advertises trams from every 10 minutes at weekends and on bank holidays, so the weekday peak comparison does not apply across the whole week.

NET says the first and last weekday tram times will stay the same. The scheduled frequency before 7am remains every 15 minutes on each line. If one departure in that hour is cancelled and the surrounding services run as planned, passengers who need that line could face a 30-minute gap.

West Bridgford Wire daily traffic and travel coverage shows cancellations stretching back to October, with several affecting passengers before the morning peak.

Date What NET reported
22 October The 06:19 from Hucknall and 06:16 from Toton Lane were cancelled. The next departures were at 06:34 and 06:31 respectively.
2 November Eleven terminus departures were listed as cancelled, including the 06:17 from Clifton South and 06:31 from Toton Lane. NET said more trams than usual needed repairs.
6 November NET warned of waits of up to 30 minutes before 7am. At 7am it said 26 of the 32 trams needed for the peak were running.
13 November NET’s 7.30am update listed 13 cancellations across all four termini.
27 November NET’s 6.05am update listed eight cancelled terminus departures, including the 06:19 from Phoenix Park.

NET says it normally needs 32 trams in service to run every seven minutes at peak times.

It says road collisions and other incidents involving the emergency services have affected fleet availability this year, with some damaged trams needing extensive repairs. Running fewer trams gives maintenance teams more time to return vehicles to service. NET’s announcement gives no figure for how many trams the temporary timetable needs or how many are currently available.

A ten-minute service that runs as scheduled could give passengers a shorter wait than they have faced on mornings with cancellations. For early starters, the test is whether departures before 7am run more consistently. During the rush hour, it is whether the new timetable reduces long gaps and how busy the trams are when they arrive.

Categories:
 

 

Latest