Works to replace 100 metres of damaged pipework needs to take place.
The traffic controls will be in place from Saturday 19 February until 9 March 2021.
They’ll operate between Bede Ling and Foxfield Way.
They will be operational for 24 hours per day.
Work is being carried out by Cadent Gas.





