Work is ongoing on the new walking and cycling link connecting Waterside Bridge with Poulton Drive.
The route will open from Thursday 18 June.
The temporary walking and cycling link between the bridge and Poulton Drive will open today (18 June by 12noon)
The previously grey abutments on the south side are being transformed into a colourful mural featuring local wildlife which will be done soon.



